Batteries and battery sets
Replacement batteries to match your system and runtime.
View batteriesUPS systems
From a compact UPS for the workstation to systems for server rooms, industry and building technology: compare models and prices and order directly.
Online UPS
Grid interactive UPS
Offline UPS
Compact backup UPS
WOW700
DIN rail UPS
Decision guide
What matters are the connected devices, the required bridging time and the installation site.
| Application | Suitable UPS | Next step |
|---|---|---|
| Router, NAS, small network | Compact UPS around 700 VA | UPS for networks |
| Tills and card terminals | Compact UPS for POS equipment | UPS for branches |
| Network cabinet and servers | 19-inch online UPS with shutdown integration | View rack UPS |
| Controls and control cabinets | DIN-rail UPS | View DIN-rail UPS |
| Buildings, elevators, plant rooms | UPS system over 10 kVA, project-planned | UPS over 10 kVA |
| Existing system | Replacement battery or successor | Battery replacement |
Tell us your devices, the required bridging time and the installation site. We recommend the UPS, battery and accessories.
The first consultation is free, by phone or video, in German or English.
Prefer to talk directly? +49 8141 4094-40
Accessories and service
Replacement batteries to match your system and runtime.
View batteriesNetwork cards for alerting and orderly shutdown.
View SNMP adaptersFor maintenance and status signals to building systems.
View bypassRails and mounting kits for the server cabinet.
View accessoriesReplacement by ERREPI, including disposal of the old batteries.
Request replacementRegular maintenance with a test report, on site in Germany, Austria and Switzerland.
View serviceWhy ERREPI?
We support businesses in selecting and maintaining their UPS systems.
Engineering, service and warehouse work together at one site.
Maintenance, battery replacement and call-out after a fault. France, Poland and other countries on request.
Industry, data centres and building technology in Europe, the USA and on the Arabian Peninsula.
FAQ
It depends on the connected devices, the active power, the power factor, the required reserve and the bridging time. If you do not know the power, we check your application based on your devices.
Autonomy time describes how long the UPS can supply the connected load from the battery during a power failure. It depends on load, battery, temperature, ageing and reserve, among other factors.
A 19-inch UPS makes sense when servers, network components or technical equipment in a rack or server cabinet need protection.
If model, power, runtime and accessories are clear, you can buy directly. If load, runtime or installation environment are unclear, we recommend a short sizing check before you buy.
By prepayment via bank transfer or with PayPal. Business customers can also buy on invoice after review and approval.
We deliver throughout the EU. Shipping within Germany is included in the price; costs for other EU countries are shown at checkout. Projects outside the EU on request.
The statutory warranty applies. Details are in our terms and conditions.
Consumers have a 14-day right of withdrawal. How it works is described in the cancellation policy.
Next step
Choose your unit in the shop, or clarify with us which power and runtime you need.